Once work begins, most full bathroom remodels in Champaign-Urbana take about two to four weeks. The planning phase before that often takes as long as the construction itself, mostly because of material lead times.
Typical timeline
| Phase | Typical duration |
|---|---|
| Design, estimates and choosing a contractor | 1–3 weeks |
| Ordering materials | 1–6 weeks (custom vanities and glass take longest) |
| Permits, if required | Days to a few weeks |
| Demolition | 1–2 days |
| Rough plumbing and electrical | 2–4 days |
| Inspection, if required | A few days |
| Walls, waterproofing and subfloor | 2–4 days |
| Tile | 3–7 days |
| Vanity, fixtures and paint | 2–4 days |
| Shower glass | 1–3 weeks after tile is finished, for measuring and fabrication |
What slows projects down
- Special-order items. Custom vanities, frameless glass and imported tile can take weeks. Order early and confirm delivery before demolition starts.
- Hidden damage. Rotted subfloors and old plumbing in older Champaign homes add days.
- Changes mid-project. Moving a fixture after rough-in means redoing work and possibly another inspection.
- Glass. Shower glass can only be measured after tile is installed, so many bathrooms are usable for a week or two before the glass arrives.
How to keep it on schedule
- Make every selection, down to grout color, before demolition.
- Have materials delivered and checked before work begins.
- Ask your contractor for a written schedule with the order of trades.
- Decide in advance how surprises will be priced and approved.
Common questions
How long does a bathroom remodel take in Champaign?
Once work starts, most full bathroom remodels take about two to four weeks. Add one to six weeks before that for design, ordering materials and permits.
Can I use the bathroom during the remodel?
Usually not. Plan for the room to be out of service for the whole construction period, and arrange another bathroom if it's your only one.