Budgets / Cosmetic Update

$5,000 – $12,000

Cosmetic Update: what this budget gets you in Champaign

New vanity, new floor, a refinished tub or new surround and new lighting. The layout and plumbing stay put.

Typical timeline
1–2 weeks
Includes
  • New vanity, countertop and faucet
  • New floor tile or luxury vinyl
  • Tub refinishing or a new acrylic tub surround
  • Glass shower door
  • New lighting, mirror and toilet
  • Paint throughout
Usually not included
  • Moving plumbing or walls
  • Custom tiled showers
  • Structural or subfloor rebuilds (beyond small repairs)
After: Cosmetic Update scope
Before: dated 1990s bathroom
BeforeAfterIllustration

$5,000 – $12,000 in ten styles

A cosmetic update replaces almost everything you see while keeping everything behind the walls. Because fixtures stay where they are, there is no new plumbing layout, no major electrical work and usually no permit, which keeps both the cost and the timeline in check.

Where the money goes

The vanity and flooring are the two biggest line items. Stock and semi-custom vanities vary widely, so this is the main place to save or splurge. Refinishing a sound tub costs a fraction of replacing it, and a quality acrylic surround installs in a day or two with far fewer grout lines than tile.

When an update is the right call

  • The tub or shower is the right size and in the right place.
  • The floor is solid and the walls are dry.
  • You want a bathroom that looks new for years without a full gut.

Watch for

Removing the old floor sometimes reveals subfloor damage around the toilet or tub. Ask your contractor how they price small repairs before work begins.