Budgets / Full Remodel

$12,000 – $25,000

Full Remodel: what this budget gets you in Champaign

Gutted to the studs: tiled tub-shower, new plumbing and wiring, new vanity, floor, toilet and lighting, same footprint.

Typical timeline
3–5 weeks
Includes
  • Demolition to the studs
  • New supply and drain lines, updated wiring
  • Waterproofed, tiled tub-shower or shower
  • New vanity, countertop, toilet and fixtures
  • New tile floor and lighting
  • Exhaust fan sized for the room
Usually not included
  • Moving walls or enlarging the room
  • Major relocation of fixtures
  • Premium extras like heated floors or frameless glass (often add-ons)
After: Full Remodel scope
Before: dated 1990s bathroom
BeforeAfterIllustration

$12,000 – $25,000 in ten styles

A full remodel is the point where everything gets replaced, including what you never see. In Champaign’s older houses, that hidden part matters most: galvanized supply lines, cast-iron drains and decades-old wiring all get replaced while the walls are open.

Where the money goes

Labor is the largest share: demolition, plumbing, electrical, waterproofing and tile. The tiled shower is usually the single biggest item. Finishes are where you can steer the total, since a mid-range tile and stock vanity keep you near the low end, while designer tile and custom cabinetry push toward the top.

When a full remodel is the right call

  • The bathroom has water damage, failing tile or outdated plumbing.
  • You plan to stay in the house for years.
  • You want the room to work better, not just look better.

Watch for

Plan for a 10 to 15 percent contingency. Opening walls in older homes almost always turns up something. Agree in writing on how surprises will be priced.