Styles / Mid-Century Modern / Premium Remodel
Mid-Century Modern bathroom on a $25,000 – $50,000 budget
Budgets at this level usually go into larger primary bathrooms, so this example starts from a bigger room than the lower tiers.
Premium mid-century trades the tub for a walk-in shower in stacked tile, adds a long walnut double vanity and globe pendants, and can bring real terrazzo or handmade tile.
Where to spend
- Handmade or glazed stacked tile
- A long walnut double vanity on tapered legs
Where to save
- Terrazzo-look porcelain if real terrazzo blows the budget
- Brass-finish fixtures from mainstream lines
What a $25,000 – $50,000 budget covers
Walk-in shower with frameless glass, double vanity, premium tile, heated floors and layered lighting. Some layout changes. Typical timeline: 5–8 weeks.
- Tub replaced by a large walk-in shower
- Frameless glass and custom tile work
- Double vanity, often semi-custom or custom
- Heated floors and layered lighting
- Some fixture relocation
- Premium fixtures and finishes
More about the premium remodel tier · Full mid-century modern style guide














