Styles / Industrial / Full Remodel

Industrial bathroom on a $12,000 – $25,000 budget

After: Industrial bathroom, full remodel scope
Before: dated 1990s bathroom
BeforeAfterIllustration

A full industrial remodel adds a brick or brick-look accent wall, concrete-look floors, a black steel-framed shower and exposed-pipe style fixtures.

Where to spend

  • A black steel-framed glass enclosure
  • One brick accent wall

Where to save

  • Brick-look tile instead of real brick near water
  • Stock black fixtures

What a $12,000 – $25,000 budget covers

Gutted to the studs: tiled tub-shower, new plumbing and wiring, new vanity, floor, toilet and lighting, same footprint. Typical timeline: 3–5 weeks.

  • Demolition to the studs
  • New supply and drain lines, updated wiring
  • Waterproofed, tiled tub-shower or shower
  • New vanity, countertop, toilet and fixtures
  • New tile floor and lighting
  • Exhaust fan sized for the room

Industrial at every budget

Other styles at $12,000 – $25,000